My Blog List

Friday 17 January 2014

Third day of shooting (15th January)

On our third day of shooting we only had an hour lesson so we were short for time and needed to get the rest of the filming finished. We finally found a dark room where we could film in the college, the 'prayer room'. It was dark enough and had tables and chairs already available for us to use. We were also able to hang the 'swinging light bulb' from the ceiling as one of our props.

We came up with dialogue on the day, we were pretty pleased with what the group came up with. We were aiming for something short, but dramatic. We had a bit of trouble with the lighting. Our intention was to use the light bulb as our main light source and then use LED lights as additional lighting to create shadows. The light bulb ending up being to bright. So we used 2 LED lights instead, one on the ceiling, replacing the light bulb (but still having it as a prop) and then the extra LED for shadowing. 

Over all we completed all of our filming, we were very pleased with the finished result of our footage and created the 'dramatic' 'horror' effect we wanted.

No comments:

Post a Comment